22. Bobruisk CHPP-1 (2005-2006)
Putting into operation a steam boiler of 30 tons of steam per hour for burning lignine and peat (supplied by Beloozersk power mechanical plant), equipped with automated control system.100 % erection and participation in commissioning activities.

21. Alumna Plant "Fria" (Guinea) (2005-2006) 
Putting into operation a turbo generator of 12 MW in combination with steam boiler of 160 tons of steam per hour. Supply and erection of the necessary equipment and materials in tropical variant, including cable structures of double hot galvanization by OBOBETTERMANN.100 % erection and participation in commissioning activities.

20. Lida CHPP(2005)
Putting into operation a turbo generator of 12 MW in replacement of a turbo generator of 6 MW. Installation of automated control system.100 % erection and participation in commissioning activities.

19. “Druzhba” Oil Transporting Company, Novopolotsk(2005)
Installation  of schemes and equipment of automated control system LDPS "Gorki".100 % erection and participation in commissioning activities

18. Erection of CHPP in Osipovichi, utilizing wooden fuel and milled coal (2005-2006)
Putting into operation one turbo generator of 1,2 MW (supplied by Proletarski Plant of Saint-Petersburg) and two boilers of 20 tons of steam per hour each (supplied by Biisk Boiler Plant in Russia), intended for utilizing peat bricks and wooden waste.100 % erection and participation in commissioning activities.

17. Gas-filling station of "Lukoil-Belorussia" Company in Minsk region (2005-2006)
Execution of the whole complex of electrical erection works.  100 % erection and participation in commissioning activities ection and participation in commissioning activities.

16. 330/110/10 kV "Kolyadichci" substation (2004-2006)
Modernizationof open switching centre 330 kV with erection of high-voltage equipment of “ABB”, including two autotransformers of 200 MWA each.100 % erection and participation in commissioning activities. 

15. National Art Museum of the Republic of Belarus (2005-2006)Execution of the whole complex of electrical works, automated control system installation and commissioning with full supply of the relevant equipment 

14. Bereza Power Station (2004-2005)
Modernization of unitsNo.5 and 6 employing turbine and boiler automatic control system by ABB in accordance with technical requirement of power systems of Poland (PSE) and Central Europe (UCTE).Modernization of Unit No.3 with erection of two gas turbines of 25 MW each.100 % erection and participation in commissioning activities.     

13. Accounting center with administrative block of the National Bank of the Republic of Belarus in Minsk (2002-2004) 
Execution of the full complex of electrical erection and commissioning works in the volume of approximately BYR 3 billion. Supply of all the power panel equipment and automatic switch boards for the amount of approximately BYR 3 billion. Installation of automated control system of “Johnson Control” Company.100 % erection and commissioning.

12.  Minsk CHPP-4 (2004-2005) 
Putting into operation a 2x2.5 MW detendre generator unit supplied by “Turbogaz” of Ukraine. Erection of automated control system by “Konstar” of Ukraine.100 % erection and participation in commissioning activitiesoning.

 

 