37. Substation 220/110/10 kV “Grodno-Yuzhnaya” in Grodno (2008-2009)
Conversion of substation to voltage of 330 kV, building of new 330 kV outdoor switchgear and installation of 2 125 MVA autotransformers, in progress.

36. Substation 110/10 kV “Vesnyanka” in Minsk (2007-2008)  
Introduction into service of  new closed-type substation, needed to sport complex “Minsk-Arena” electric supply, in combination with 2 40 MVA transformers and 110 kV packaged gas-insulated distribution device made by “Siemens”. 100% installation of construction and electric part and adjustment support.

35. RUE “Vitebskenergo” (2008) 
Reconstruction of carrier line and electric supply network of computer equipment in the premises of  RUE “Vitebskenergo 10 kV packaged gas-insulated distribution device made by “Siemens”. 100% installation of construction and electric part and adjustment support.

34. JSC “Grodno – Azot” (2007-2008) Commissioning of 2 7,8 MW gas-turbine units, each for electric supply and fuel use reliability growth.

33. Substation 110/10 kV “Glusk” (2008) 
Substitution of outmoded high-voltage equipment for new equipment  made by “Siemens” and “ZETO”, Velikie Luki, has been completed. 

32.Substation 330/110/35 kV “Polotskaya” (2008)
 Substitution of outmoded high-voltage equipment at 330 kV outdoor switchgear for new equipment made by “ABB”, “Siemens” and “ZETO”, Velikie Luki, has been completed. p> Commissioning of 2 7,8 MW gas-turbine units, each for electric supply and fuel use reliability growth.

31. Construction of a step-dow station  110/6 kV of the RUEP Association  «Belaruskali»(2007-2008) 
The whole complex of electrical installation as well as constructing work is performed. , each for electric supply and fuel use reliability growth.

30.Reconstruction of Minsk Cogeneration Plant-3(2005-2008) 
At present, installation of instrumentation and automated control systems is going on. The work is performed for putting  into operation an exhaust-heat boiler including combined cycle  gas unit-230 (supplied by the GEC ALSTOM company).  Assembly if high voltage equipment-110 kV–developed by Siemens

29. National Academic Opera and Ballet Theatre of the Republic of Belarus (2006-2007) 
A full complex of electrical erection works is being conducted, works on automated control system and commissioning. st-language:RU;mso-bidi-language:AR-SA; layout-grid-mode:line'>  Assembly if high voltage equipment-110 kV–developed by Siemens

28. Belorussian Power Station (2006-2007) Putting into operation
a turbo generator of 2,4 MW in combination with steam boiler of 20 tons of steam per hour for burning wooden fuel and peat.100 % erection and participation in commissioning activities. 

27. Mini-CHPP on wooden waste in Pinsk (2006-2007)Putting into operation a turbo generator of 1,2 MW in combination with two steam boilers of 10 tons of steam per hour each, utilizing wood chips 100 % erection and participation in commissioning activities 

26. Mini-CHPP on the base of RK-3 of Molodechno Power Main in Vileika (2006-2007) 
Putting into operation a turbo generator of 2,4 MW in combination with steam boiler of 20 tons of steam per hour, utilizing wood chips (supply by "AXIS Indastries" (Lithuania)). 100 % erection and participation in commissioning activities.

25. “Severnaya” Mini-CHPP in Grodno (2006)
Putting into operation a gas turbine unit of 6 MW in combination with steam heat-recovery boiler of 14 tons of steam per hour.100 % erection and participation in commissioning activities. 

24. Baranovichi CHPP (2006)
Putting into operation a back pressure turbine of 12 MW in replacement of 6 MW turbo units, with installation of automated control system and group combined control board.100 % erection and participation in commissioning activities. and participation in commissioning activities.

23. Lukoml Power Station (2005-2006) Modernization
of open switching centre 330 kV unit No.1 with erection of high voltage equipment of 330kV by "Areva" and "Siemens".Putting into operation a detendre generator recovery power unit of 2,5 MW, working in full auto mode.100 % erection and participation in commissioning activities.