Realised projects

50. 330/110/220- kV Substation “Brest-1”. (2009 - -2011).
Construction and electric installation works for transfer of substation to 330 kV voltage with erection of new 330 kV outdoor switchgear and installation of new high-voltage equipment manufactured by ABB and SIEMENS, disassembling of existing and construction of new 110 kV outdoor switchgear with installation of new high-voltage equipment manufactured by ABB and SIEMENS with installation of 200 MWA autotransformer.

49. Reconstruction of Minsk TPP-2. (2008-2010).
Complex of electrical installation works, C&I works for commissioning of steam gas 32.5 MW units consisting of: gas turbine SGT-600 manufactured by Siemens, HRSG manufactured by AE&E Nanjing Boiler Co. Ltd (China), steam turbine manufactured by "Luoyang generating equipment Co Ltd" (China).

48. Substation 110/10 kV "Nemiga" in Minsk (2007-2010).
Full complex of construction works for enclosed-type substation designed for energy supply of buildings and structures situated at the Nezavisimosti square and adjoining area.

47. Substation 110/10 kV "Grodno-Yuzhnaia" in Grodno (2008-2010).
Works for transition of substation to 330 kV voltage with construction of new outdoor switchgear and installation of two autotransformers with 125 MW capacity. erif";font-weight:normal; mso-bidi-font-weight:bold'>manufactured by Siemens, HRSG manufactured by AE&E Nanjing Boiler Co. Ltd (China), steam turbine manufactured by "Luoyang generating equipment Co Ltd" (China). 

46. SPO “Belenergo: (2009-2010).
Works for creation of automated electric energy control and registering system at interstate cross-flows and generation at SPA “Belenergo”. 

45. Brest TPP (2008 - -2009).  
Installation of anti-pressure turbine ПР-12-3.4 of Kaluga turbine plant (Russia). 100 % installation of construction and electrical part and participation in adjustment.

44. UE “Zavod poluprovodnikovyh priborov” at SPA “Integral” (2008)
Erection of four gas-piston electric power generating plants manufactured by Deutz Power Systems (Germany) with unit capacity of 3 MW for “Energotechnological complex for submicron production” was completed. 100% installation and participation in adjustment works areast-font-family: "Times New Roman";mso-ansi-language:RU;mso-fareast-language:RU;mso-bidi-language: AR-SA'>ПР-12-3.4 of Kaluga turbine plant (Russia). 

43. JSC Slonimskaya KPF(2007-2009) 
Commissioning of two Gas-Piston installation units of 1 MW each (“FG Wilson” (England).100 %  assembly and participation in adjustment. or “Energotechnological complex for submicron production” was completed. 100% installation and participation in adjustment works 

42. Electric power station, island Xios (Greece) (2008-2009) 
Commissioning of 14,5 MW diesel-generating unit with exhaust-heat boiler. 100 %  assembly and participation in adjustment.

41. Zhlobin boiler plant (2007-2008) 
Commissioning of three Gas-Piston installation units of 8,5 MW each. 100 %  assembly and participation in adjustment.

40. Zhodino cogeneration plant (2008-2009) 
Commissioning of steam boiler aggregate of Е-60-9.5-510 DTF with capacity 60 tonnes of steam per hour supplied by wood fuel.100% installation and participation in adjustment works

39. JSC Svetlogorskii CKK (2007-2008)
Commissioning of turboset P-4-3,4/0,5-1 of Caluga turbine factory with TPS-4-2E UZ OOO “Polez” generator.

38. Substation 110/10 kV “Nemiga” in Minsk (2007-2009)
 Full range of  building works of  closed-type substation, intended for electric supply of buildings and constructions, located at Nezavisimosti sq. and adjacent region, in progress.

 